   projectmap => Hph\Projectmap\Domain\Model\ProjectMapprototypepersistent entity (uid=20, pid=76)
      slug => protected'consultancy-services-for-preparation-of-a-dredging-project-at-durres-port-98
         4
' (77 chars) title => protected'Consultancy Services for Preparation of a Dredging Project at Durres Port' (73 chars) category => protected'Hydrography & Dredging, Sustainability' (38 chars) client => protected'Durres Port Authority' (21 chars) link => protected'' (0 chars) street => protected'' (0 chars) zip => protected'' (0 chars) city => protected'Durres, Albania' (15 chars) lat => protected'' (0 chars) lng => protected'' (0 chars) period => protected'05/2010 - 10/2010' (17 chars) date => protectedDateTimeprototypeobject (2010-10-01T00:00:00+02:00, 1285884000) financedby => protected'Client' (6 chars) description => protected'<h3>The Challenge</h3> <p>In order to allow vessels with a size of 30,000 D
         WT or 1,700 TEU to visit the Port of Durres in the near future, the entrance
          channel, the basin and berths of the port should be deepened through a Capi
         tal Dredging Campaign, to be tendered by Durres Port Authority. For this rea
         son Durres Port Authority contracted HPC to elaborate the design and complet
         e tender documents for the dredging works to deepen the entrance channel and
          the basin of its port and to conduct an Environmental Impact Assessment (EI
         A). The studies were accompanied by field investigations, such as geotechnic
         al investigations, bathymetric surveys and environmental analysis of sedimen
         t samples.In order to allow vessels with a size of 30,000 DWT or 1,700 TEU t
         o visit the Port of Durres in the near future, the entrance channel, the bas
         in and berths of the port should be deepened through a Capital Dredging Camp
         aign, to be tendered by Durres Port Authority. For this reason Durres Port A
         uthority contracted HPC to elaborate the design and complete tender document
         s for the dredging works to deepen the entrance channel and the basin of its
          port and to conduct an Environmental Impact Assessment (EIA). The studies w
         ere accompanied by field investigations, such as geotechnical investigations
         , bathymetric surveys and environmental analysis of sediment samples.</p> <
         h3>Tasks Performed</h3> <ul> <li>Execution, processing and interpretation
         of bathymetric surveys</li> <li>Execution, processing and interpretation of
          geotechnical surveys, such as vibro-coring, cone penetration tests, 2D elec
         trical imaging and sub-bottom profiling</li> <li>Laboratory analysis of soi
         l samples</li> <li>Design of dredging works and estimation of dredging volu
         mes and costs</li> <li>Elaboration of Terms of References for dredging work
         s</li> <li>Finalisation of complete tender documents for dredging works</li
         > <li>Environmental Impact Assessment, including information review, descri
         ption of legislative and...
' (2473 chars) contactpersons => protectedTYPO3\CMS\Extbase\Persistence\ObjectStorageprototypeobject (2 items) 00000000000010bd0000000000000000 => Hph\Projectmap\Domain\Model\Contactpersonprototypepersistent entity (uid=25, pid=76) name => protected'Jörg Geerke' (12 chars) position => protected'' (0 chars) phone => protected'' (0 chars) mail => protected'j.geerke@hpc-hamburg.de' (23 chars) image => protectedTYPO3\CMS\Extbase\Domain\Model\FileReferenceprototypemodified entity (uid=442, pid=76) uidLocal => protected267 (integer) originalResource => protectedTYPO3\CMS\Core\Resource\FileReferenceprototypeobject propertiesOfFileReference => protectedarray(28 items) uid => 442 (integer) pid => 76 (integer) tstamp => 1702312218 (integer) crdate => 1691503777 (integer) cruser_id => 6 (integer) deleted => 0 (integer) hidden => 0 (integer) sys_language_uid => 0 (integer) l10n_parent => 0 (integer) l10n_state => NULL l10n_diffsource => '{"alternative":"","description":"","link":"","title":"","crop":"","uid_local
                        ":"","hidden":"","sys_language_uid":""}
' (115 chars) t3ver_oid => 0 (integer) t3ver_wsid => 0 (integer) t3ver_state => 0 (integer) t3ver_stage => 0 (integer) uid_local => 267 (integer) uid_foreign => 25 (integer) tablenames => 'tx_projectmap_domain_model_contactperson' (40 chars) fieldname => 'image' (5 chars) sorting_foreign => 1 (integer) table_local => 'sys_file' (8 chars) title => NULL description => NULL alternative => NULL link => '' (0 chars) crop => '{"default":{"cropArea":{"height":0.493,"width":1,"x":0,"y":0.141},"selectedR
                        atio":"4:3","focusArea":null}}
' (106 chars) autoplay => 0 (integer) showinpreview => 1 (integer)
originalFile => protectedTYPO3\CMS\Core\Resource\Fileprototypeobject updatedProperties => protectedarray(empty)max depth metaDataAspect => privateTYPO3\CMS\Core\Resource\MetaDataAspectprototypeobjectmax depth (21 items) properties => protectedarray(15 items)max depth storage => protectedTYPO3\CMS\Core\Resource\ResourceStorageprototypeobjectmax depth identifier => protected'/HPC/Bilder/Ansprechpartner/Ge_BusinessPic.jpg' (46 chars) name => protected'Ge_BusinessPic.jpg' (18 chars) deleted => protectedFALSE mergedProperties => protectedarray(47 items) uid => 442 (integer) pid => 76 (integer) tstamp => 1702312218 (integer) crdate => 1691503777 (integer) cruser_id => 6 (integer) deleted => 0 (integer) hidden => 0 (integer) sys_language_uid => 0 (integer) l10n_parent => 0 (integer) l10n_state => NULL l10n_diffsource => '{"alternative":"","description":"","link":"","title":"","crop":"","uid_local
                        ":"","hidden":"","sys_language_uid":""}
' (115 chars) t3ver_oid => 0 (integer) t3ver_wsid => 0 (integer) t3ver_state => 0 (integer) t3ver_stage => 0 (integer) uid_local => 267 (integer) uid_foreign => 25 (integer) tablenames => 'tx_projectmap_domain_model_contactperson' (40 chars) fieldname => 'image' (5 chars) sorting_foreign => 1 (integer) table_local => 'sys_file' (8 chars) title => NULL description => NULL alternative => 'A portrait of a man standing in front of a grey wall, smiling at the camera.' (76 chars) link => '' (0 chars) crop => '{"default":{"cropArea":{"height":0.493,"width":1,"x":0,"y":0.141},"selectedR
                        atio":"4:3","focusArea":null}}
' (106 chars) autoplay => 0 (integer) showinpreview => 1 (integer) missing => 0 (integer) type => '2' (1 chars) storage => 1 (integer) identifier => '/HPC/Bilder/Ansprechpartner/Ge_BusinessPic.jpg' (46 chars) identifier_hash => '1461d01efea1650dfd38e61db604601c6899f78f' (40 chars) extension => 'jpg' (3 chars) mime_type => 'image/jpeg' (10 chars) name => 'Ge_BusinessPic.jpg' (18 chars) sha1 => '8135a5f07bd9ca719a6fb4839acaba34e31b2b19' (40 chars) size => 4974079 (integer) creation_date => 1691503701 (integer) modification_date => 1691503701 (integer) folder_hash => 'd6deae4d86f248a27977ec0bc11b963d90b2182c' (40 chars) t3_origuid => 0 (integer) file => 267 (integer) width => 3496 (integer) height => 5328 (integer) categories => 0 (integer) metadata_uid => 267 (integer)
modified uid => protected442 (integer) _localizedUid => protected442 (integer)modified _languageUid => protected0 (integer)modified _versionedUid => protected442 (integer)modified pid => protected76 (integer)
uid => protected25 (integer) _localizedUid => protected25 (integer)modified _languageUid => protected-1 (integer)modified _versionedUid => protected25 (integer)modified pid => protected76 (integer)
00000000000010e30000000000000000 => Hph\Projectmap\Domain\Model\Contactpersonprototypepersistent entity (uid=13, pid=76) name => protected'Tatiana Eggert' (14 chars) position => protected'' (0 chars) phone => protected'' (0 chars) mail => protected't.eggert@hpc-hamburg.de' (23 chars) image => protectedTYPO3\CMS\Extbase\Domain\Model\FileReferenceprototypemodified entity (uid=417, pid=76) uidLocal => protected256 (integer) originalResource => protectedTYPO3\CMS\Core\Resource\FileReferenceprototypeobject propertiesOfFileReference => protectedarray(28 items) uid => 417 (integer) pid => 76 (integer) tstamp => 1702312488 (integer) crdate => 1691157509 (integer) cruser_id => 6 (integer) deleted => 0 (integer) hidden => 0 (integer) sys_language_uid => -1 (integer) l10n_parent => 0 (integer) l10n_state => NULL l10n_diffsource => '{"alternative":"","description":"","link":"","title":"","crop":"","uid_local
                        ":"","hidden":"","sys_language_uid":""}
' (115 chars) t3ver_oid => 0 (integer) t3ver_wsid => 0 (integer) t3ver_state => 0 (integer) t3ver_stage => 0 (integer) uid_local => 256 (integer) uid_foreign => 13 (integer) tablenames => 'tx_projectmap_domain_model_contactperson' (40 chars) fieldname => 'image' (5 chars) sorting_foreign => 1 (integer) table_local => 'sys_file' (8 chars) title => NULL description => NULL alternative => NULL link => '' (0 chars) crop => '{"default":{"cropArea":{"height":0.51,"width":1,"x":-0.0014705882352941176,"
                        y":0.077},"selectedRatio":"4:3","focusArea":null}}
' (126 chars) autoplay => 0 (integer) showinpreview => 1 (integer)
originalFile => protectedTYPO3\CMS\Core\Resource\Fileprototypeobject updatedProperties => protectedarray(empty)max depth metaDataAspect => privateTYPO3\CMS\Core\Resource\MetaDataAspectprototypeobjectmax depth (21 items) properties => protectedarray(15 items)max depth storage => protectedTYPO3\CMS\Core\Resource\ResourceStorageprototypeobjectmax depth identifier => protected'/HPC/Bilder/Ansprechpartner/TE_BusinessPic.jpg' (46 chars) name => protected'TE_BusinessPic.jpg' (18 chars) deleted => protectedFALSE mergedProperties => protectedarray(47 items) uid => 417 (integer) pid => 76 (integer) tstamp => 1702312488 (integer) crdate => 1691157509 (integer) cruser_id => 6 (integer) deleted => 0 (integer) hidden => 0 (integer) sys_language_uid => -1 (integer) l10n_parent => 0 (integer) l10n_state => NULL l10n_diffsource => '{"alternative":"","description":"","link":"","title":"","crop":"","uid_local
                        ":"","hidden":"","sys_language_uid":""}
' (115 chars) t3ver_oid => 0 (integer) t3ver_wsid => 0 (integer) t3ver_state => 0 (integer) t3ver_stage => 0 (integer) uid_local => 256 (integer) uid_foreign => 13 (integer) tablenames => 'tx_projectmap_domain_model_contactperson' (40 chars) fieldname => 'image' (5 chars) sorting_foreign => 1 (integer) table_local => 'sys_file' (8 chars) title => NULL description => NULL alternative => 'A portrait of a woman standing in front of a light grey wall, smiling at the
                         camera.
' (84 chars) link => '' (0 chars) crop => '{"default":{"cropArea":{"height":0.51,"width":1,"x":-0.0014705882352941176,"
                        y":0.077},"selectedRatio":"4:3","focusArea":null}}
' (126 chars) autoplay => 0 (integer) showinpreview => 1 (integer) missing => 0 (integer) type => '2' (1 chars) storage => 1 (integer) identifier => '/HPC/Bilder/Ansprechpartner/TE_BusinessPic.jpg' (46 chars) identifier_hash => '9df0fe76d425024c1d2045c798982824260b7a91' (40 chars) extension => 'jpg' (3 chars) mime_type => 'image/jpeg' (10 chars) name => 'TE_BusinessPic.jpg' (18 chars) sha1 => '3aa3e0d83c5629044e5999781ca62211f58f0c53' (40 chars) size => 4545248 (integer) creation_date => 1691157047 (integer) modification_date => 1691157047 (integer) folder_hash => 'd6deae4d86f248a27977ec0bc11b963d90b2182c' (40 chars) t3_origuid => 0 (integer) file => 256 (integer) width => 3588 (integer) height => 5273 (integer) categories => 0 (integer) metadata_uid => 256 (integer)
modified uid => protected417 (integer) _localizedUid => protected417 (integer)modified _languageUid => protected-1 (integer)modified _versionedUid => protected417 (integer)modified pid => protected76 (integer)
uid => protected13 (integer) _localizedUid => protected13 (integer)modified _languageUid => protected-1 (integer)modified _versionedUid => protected13 (integer)modified pid => protected76 (integer)
continents => protectedTYPO3\CMS\Extbase\Persistence\ObjectStorageprototypeobject (1 items) 00000000000011640000000000000000 => Hph\Projectmap\Domain\Model\Continentprototypepersistent entity (uid=1, pid=76) title => protected'Europe' (6 chars) detailpage => protected't3://page?uid=77' (16 chars) uid => protected1 (integer) _localizedUid => protected1 (integer)modified _languageUid => protected-1 (integer)modified _versionedUid => protected1 (integer)modified pid => protected76 (integer) projects => protectedTYPO3\CMS\Extbase\Persistence\ObjectStorageprototypeobject (4 items) 000000000000117c0000000000000000 => Hph\Projectmap\Domain\Model\ProjectMapprototypepersistent entity (uid=21, pid=76) slug => protected'supervision-of-construction-works-for-the-extension-of-odessa-container-term
               inal-1113
' (85 chars) title => protected'Supervision of Construction Works for the Extension of Odessa Container Term
               inal
' (80 chars) category => protected'Engineering Consulting' (22 chars) client => protected'HPC Ukraina' (11 chars) link => protected'' (0 chars) street => protected'' (0 chars) zip => protected'' (0 chars) city => protected'Odessa, Ukraine' (15 chars) lat => protected'' (0 chars) lng => protected'' (0 chars) period => protected'02/2011 - 02/2014' (17 chars) date => protectedDateTimeprototypeobject (2014-02-01T00:00:00+01:00, 1391209200) financedby => protected'Client' (6 chars) description => protected'<h3>The Challenge</h3> <p>Based on an investment agreement HPC Ukraina and
               Odessa Commercial Sea Port Administration jointly constructed the extension
               of the Quarantine Mole container terminal in order to increase its container
                handling capacity by 600,000 TEU per year. Odessa Commercial Sea Port provi
               ded 650 m quay wall and apron, a breakwater and dredging works. HPC Ukraina'
               s investment programme had a volume of about USD 90m and consisted of four l
               ots for reclamation of about 20 ha terminal area and construction of souther
               n and northern embankments, pavement and drainage works, installation of HT
               (35KV) feed line and MT/LT (6.0/0.4KV) grids, transformer stations and light
               ing system, and installation of three super post panamax STS container crane
               s. HPC was awarded the contract for elaboration of tender documents, tender
               evaluation, assistance in contract negotiations and supervision of construct
               ion for all lots.</p> <h3>Tasks Performed</h3> <ul> <li>Review and modifi
               cation of working design prepared by local A/E companies</li> <li>Preparati
               on of complete tender documents for international competitive bidding proced
               ures</li> <li>Arrangement of pre-bid meetings and site visits, technical an
               d commercial evaluation of bids, recommendation for award and assistance in
               contract negotiations</li> <li>Advice on all technical, commercial and lega
               l contract matters, preparation of contract amendments and addenda during ex
               ecution of construction works, acting as Client's Engineer</li> <li>Supervi
               sion of geotechnical, bathymetric and topographic surveys, soil investigatio
               ns, laboratory tests, review and approval of settlement calculations and det
               ermination of reclamation technique and volume</li> <li>Permanent site supe
               rvision for all construction and installation works, including testing and p
               rovisional acceptance as well as final acceptance and commissioning</li> <l
               i>Review and approval of contractors' invoices, release of payments and fina
               ncial contract managemen...
' (2250 chars) contactpersons => protectedTYPO3\CMS\Extbase\Persistence\ObjectStorageprototypeobject (1 items) 00000000000010bd0000000000000000 => Hph\Projectmap\Domain\Model\Contactpersonprototypepersistent entitysee above (uid=25, pid=76) continents => protectedTYPO3\CMS\Extbase\Persistence\ObjectStorageprototypeobject (1 items) 00000000000011640000000000000000 => Hph\Projectmap\Domain\Model\Continentprototypepersistent entitysee above (uid=1, pid=76) projects => protectedTYPO3\CMS\Extbase\Persistence\ObjectStorageprototypeobject (4 items) 00000000000011880000000000000000 => Hph\Projectmap\Domain\Model\ProjectMapprototypepersistent entity (uid=61, pid=76) slug => protected'preparation-of-regulations-and-organizational-development-plan-for-ghana-mar
                     itime-authority-1132
' (96 chars) title => protected'Preparation of Regulations and Organizational Development Plan for Ghana Mar
                     itime Authority
' (91 chars) category => protected'Organisation, Personnel & Training' (34 chars) client => protected'Ministry of Transport' (21 chars) link => protected'' (0 chars) street => protected'' (0 chars) zip => protected'' (0 chars) city => protected'Accra/Akosombo, Ghana' (21 chars) lat => protected'' (0 chars) lng => protected'' (0 chars) period => protected'09/2013 - 10/2014' (17 chars) date => protectedDateTimeprototypeobject (2014-10-01T00:00:00+02:00, 1412114400) financedby => protected'Client' (6 chars) description => protected'<h3>Challenge</h3> <p>The Ghana Maritime Authority (GMA) is in charge of mo
                     nitoring, regulating and coordinating activities of Ghana's maritime industr
                     y. By law GMA is also the regulatory body for inland waterway transportation
                     , but there were only a few standards or regulations governing the boats, op
                     erators, routes, navigation and operating conditions under its regulatory re
                     mit. The Ministry of Transport concerned with improving the short- and long-
                     term quality of inland water transport formulated a strategic approach to ov
                     ercome this situation and commissioned HPC to prepare regulations and an org
                     anizational development plan for GMA so that it can fulfil its regulatory ma
                     ndate for inland waterway transportation in Ghana.</p> <h3>Tasks Performed<
                     /h3> <ul> <li>Review of international standards and regulations for inland
                      waterway transportation and assessment of their suitability for adoption in
                      Ghana</li> <li>Elaboration of an overall regulatory framework proposing th
                     e institutional arrangements needed by GMA to fulfil its inland waterways re
                     gulatory mandate</li> <li>Review of GMA's current organizational structure
                     and elaboration of a proposal for an outline structure that allows GMA to fu
                     lfil its inland waterways regulatory mandate</li> <li>Development of rules
                     and regulations affecting the inland waterway transportation in Ghana</li>
                     <li>Elaboration of an organizational development plan to enable GMA to fulfi
                     l its mandate and functions for the development and regulation of inland wat
                     erway transportation, including job description, budget and training require
                     ments</li> <li>Bathymetric surveys in order to recommend areas on the Volta
                      Lake where tree stumps, hazarding navigation of boats on the lake are consi
                     dered for removal and where navigational aids shall be provided</li> <li>Pr
                     eparation of business cases for the removal of tree stumps, provision of nav
                     igational aids and charting of the whole lake</li> </ul> <h3>Benefit</h3>
                     <p>Strategic realignment...
' (2238 chars) contactpersons => protectedTYPO3\CMS\Extbase\Persistence\ObjectStorageprototypeobject (2 items) 00000000000011d00000000000000000 => Hph\Projectmap\Domain\Model\Contactpersonprototypepersistent entitymax depth (uid=30, pid=76) 00000000000010bd0000000000000000 => Hph\Projectmap\Domain\Model\Contactpersonprototypepersistent entitysee above (uid=25, pid=76) continents => protectedTYPO3\CMS\Extbase\Persistence\ObjectStorageprototypeobject (1 items) 00000000000011e60000000000000000 => Hph\Projectmap\Domain\Model\Continentprototypepersistent entitymax depth (uid=4, pid=76) projects => protectedTYPO3\CMS\Extbase\Persistence\ObjectStorageprototypeobject (4 items) 000000000000117c0000000000000000 => Hph\Projectmap\Domain\Model\ProjectMapprototypepersistent entitysee above (uid=21, pid=76) 00000000000011dd0000000000000000 => Hph\Projectmap\Domain\Model\ProjectMapprototypepersistent entitymax depth (uid=35, pid=76) 00000000000022b00000000000000000 => Hph\Projectmap\Domain\Model\ProjectMapprototypepersistent entitymax depth (uid=58, pid=76) 000000000000107e0000000000000000 => Hph\Projectmap\Domain\Model\ProjectMapprototypepersistent entitysee above (uid=20, pid=76) image => protectedTYPO3\CMS\Extbase\Domain\Model\FileReferenceprototypepersistent entity (uid=860, pid=76) uidLocal => protected462 (integer) originalResource => protectedNULL uid => protected860 (integer) _localizedUid => protected860 (integer)modified _languageUid => protected-1 (integer)modified _versionedUid => protected860 (integer)modified pid => protected76 (integer) uid => protected61 (integer) _localizedUid => protected61 (integer)modified _languageUid => protected-1 (integer)modified _versionedUid => protected61 (integer)modified pid => protected76 (integer)
0000000000001d810000000000000000 => Hph\Projectmap\Domain\Model\ProjectMapprototypepersistent entity (uid=57, pid=76) slug => protected'reviving-green-inland-water-transport-in-africa-1257' (52 chars) title => protected'Reviving Green Inland Water Transport in Africa' (47 chars) category => protected'Sustainability, Transport Economics' (35 chars) client => protected'The World Bank' (14 chars) link => protected'' (0 chars) street => protected'' (0 chars) zip => protected'' (0 chars) city => protected'Lake Victoria Region, Tanzania' (30 chars) lat => protected'' (0 chars) lng => protected'' (0 chars) period => protected'01/2017 - 11/2017' (17 chars) date => protectedDateTimeprototypeobject (2017-11-01T00:00:00+01:00, 1509490800) financedby => protected'Client' (6 chars) description => protected'<h3>Challenge</h3> <p>Recent development of hinterland transport in Africa
                     shows a widely skewed distribution towards road traffic even though road tra
                     nsport is generally considered less environmentally friendly than lake trans
                     port. The World Bank commissioned HPC to conduct a study – using the examp
                     le of Lake Victoria in Tanzania – to demonstrate and inform policy makers
                     of the importance of inland waterway transport and to identify suitable meas
                     ures for the promotion of such transport.</p> <h3>Tasks Performed</h3> <ul
                     > <li>Assess the transport situation on and around Lake Victoria</li> <li>
                     Design and conduct a large-scale data collection program (traffic counts, O/
                     D surveys and industry surveys) at Lake Victoria</li> <li>Elaborate a stati
                     stical methodology (logit model) to assess the main determinants of mode cho
                     ice (road transport vs. lake transport) at Lake Victoria</li> <li>Assess re
                     gulatory and institutional environment for road and lake transport</li> <li
                     >Identify policy recommendations to incentivize lake transport</li> <li>Rev
                     iew technologies of road and lake transport to calculate fuel consumption an
                     d emissions</li> <li>Field study to measure actual fuel consumption and emi
                     ssions at Lake Victoria</li> <li>Estimate the potential for emissions savin
                     gs arising from the promotion of lake transport</li> </ul> <h3>Benefit&nbsp
                     ;</h3> <ul> <li>Demonstrate the importance of green logistics in Africa gi
                     ven the risks of climate change</li> <li>Assessed policy mechanism to incen
                     tivize the use of lake transport</li> <li>Hands-on guidelines on how to sha
                     pe an efficient and low-emission transport sector in the Lake Victoria regio
                     n</li> </ul>
' (1684 chars) contactpersons => protectedTYPO3\CMS\Extbase\Persistence\ObjectStorageprototypeobject (2 items) 00000000000012f10000000000000000 => Hph\Projectmap\Domain\Model\Contactpersonprototypepersistent entitymax depth (uid=7, pid=76) 00000000000010e30000000000000000 => Hph\Projectmap\Domain\Model\Contactpersonprototypepersistent entitysee above (uid=13, pid=76) continents => protectedTYPO3\CMS\Extbase\Persistence\ObjectStorageprototypeobject (1 items) 00000000000011e60000000000000000 => Hph\Projectmap\Domain\Model\Continentprototypepersistent entitymax depth (uid=4, pid=76) projects => protectedTYPO3\CMS\Extbase\Persistence\ObjectStorageprototypeobject (4 items) 000000000000117c0000000000000000 => Hph\Projectmap\Domain\Model\ProjectMapprototypepersistent entitysee above (uid=21, pid=76) 0000000000001d420000000000000000 => Hph\Projectmap\Domain\Model\ProjectMapprototypepersistent entitymax depth (uid=16, pid=76) 000000000000107e0000000000000000 => Hph\Projectmap\Domain\Model\ProjectMapprototypepersistent entitysee above (uid=20, pid=76) 0000000000001c9c0000000000000000 => Hph\Projectmap\Domain\Model\ProjectMapprototypepersistent entitymax depth (uid=90, pid=76) image => protectedTYPO3\CMS\Extbase\Domain\Model\FileReferenceprototypepersistent entity (uid=870, pid=76) uidLocal => protected469 (integer) originalResource => protectedNULL uid => protected870 (integer) _localizedUid => protected870 (integer)modified _languageUid => protected-1 (integer)modified _versionedUid => protected870 (integer)modified pid => protected76 (integer) uid => protected57 (integer) _localizedUid => protected57 (integer)modified _languageUid => protected-1 (integer)modified _versionedUid => protected57 (integer)modified pid => protected76 (integer)
0000000000001d420000000000000000 => Hph\Projectmap\Domain\Model\ProjectMapprototypepersistent entity (uid=16, pid=76) slug => protected'sustenergyport-simulation-based-assessment-of-measures-to-increase-the-energ
                     y-sustainability-in-port-operation-1331
' (115 chars) title => protected'SustEnergyPort – Simulation-based Assessment of Measures to increase the E
                     nergy Sustainability in Port Operation
' (114 chars) category => protected'Sustainability, Simulation' (26 chars) client => protected'Bundesministerium für Verkehr und digitale Infrastruktur (BMVi, Federal Min
                     istry of Traffic and Digital Infrastructure)
' (120 chars) link => protected'' (0 chars) street => protected'' (0 chars) zip => protected'' (0 chars) city => protected'Hamburg, Germany' (16 chars) lat => protected'' (0 chars) lng => protected'' (0 chars) period => protected'07/2017 - 06/2019' (17 chars) date => protectedDateTimeprototypeobject (2019-06-01T00:00:00+02:00, 1559340000) financedby => protected'Client' (6 chars) description => protected'<h3>The Challenge</h3> <p>For the maritime industry worldwide, energy susta
                     inability has become an important topic not only to meet increasingly strict
                      environmental regulations but especially as a means of improving profitabil
                     ity. Against this background the Client has awarded HPC to develop a structu
                     red, model-based approach that can be used by ports and terminals to identif
                     y suitable measures to increase their energy sustainability and thus improve
                      their environmental compatibility and profitability. As a result, the proje
                     ct paves the way for prosperous logistics service provision,which is in line
                      with community and environmental requirements. A central project result is
                     a simulation and lifecycle assessment model to configure the logistics and e
                     nergy consumption of a port or terminal.</p> <h3>Tasks Performed</h3> <ul>
                      <li>Develop a structured procedure that can be applied by ports and termin
                     als to improve their level of energy sustainability</li> <li>Prepare a gene
                     ric energy sustainability measures catalogue for ports and terminals</li> <
                     li>Development of a simulation tool for modelling the energy consumption of
                     a port / terminal</li> <li>Develop a model for assessing the environmental
                     impact of energy sustainability measures</li> <li>Set up models for the eco
                     nomic assessment of energy sustainability measures</li> <li>Verify the deve
                     loped procedure and models by comprehensive field studies</li> <li>Examine
                     the transfer potential of the procedure in related fields of application</li
                     > </ul> <h3>Benefit&nbsp;</h3> <ul> <li>Well-structured approach to ident
                     ify measures for energy efficiency improvement and to increase the use of re
                     newable energy</li> <li>Provision of simulation-based load profile analysis
                     </li> <li>Cost-effective but realistic assessment of energy sustainability
                     measures and economic analyses</li> </ul>
' (1865 chars) contactpersons => protectedTYPO3\CMS\Extbase\Persistence\ObjectStorageprototypeobject (2 items) 000000000000164f0000000000000000 => Hph\Projectmap\Domain\Model\Contactpersonprototypepersistent entitymax depth (uid=23, pid=76) 00000000000016370000000000000000 => Hph\Projectmap\Domain\Model\Contactpersonprototypepersistent entitymax depth (uid=8, pid=76) continents => protectedTYPO3\CMS\Extbase\Persistence\ObjectStorageprototypeobject (1 items) 00000000000011640000000000000000 => Hph\Projectmap\Domain\Model\Continentprototypepersistent entitysee above (uid=1, pid=76) projects => protectedTYPO3\CMS\Extbase\Persistence\ObjectStorageprototypeobject (3 items) 000000000000117c0000000000000000 => Hph\Projectmap\Domain\Model\ProjectMapprototypepersistent entitysee above (uid=21, pid=76) 0000000000001d810000000000000000 => Hph\Projectmap\Domain\Model\ProjectMapprototypepersistent entitysee above (uid=57, pid=76) 000000000000107e0000000000000000 => Hph\Projectmap\Domain\Model\ProjectMapprototypepersistent entitysee above (uid=20, pid=76) image => protectedTYPO3\CMS\Extbase\Domain\Model\FileReferenceprototypepersistent entity (uid=1295, pid=76) uidLocal => protected723 (integer) originalResource => protectedNULL uid => protected1295 (integer) _localizedUid => protected1295 (integer)modified _languageUid => protected-1 (integer)modified _versionedUid => protected1295 (integer)modified pid => protected76 (integer) uid => protected16 (integer) _localizedUid => protected16 (integer)modified _languageUid => protected-1 (integer)modified _versionedUid => protected16 (integer)modified pid => protected76 (integer)
000000000000107e0000000000000000 => Hph\Projectmap\Domain\Model\ProjectMapprototypepersistent entitysee above (uid=20, pid=76)
image => protectedTYPO3\CMS\Extbase\Domain\Model\FileReferenceprototypepersistent entity (uid=1299, pid=76) uidLocal => protected727 (integer) originalResource => protectedNULL uid => protected1299 (integer) _localizedUid => protected1299 (integer)modified _languageUid => protected-1 (integer)modified _versionedUid => protected1299 (integer)modified pid => protected76 (integer) uid => protected21 (integer) _localizedUid => protected21 (integer)modified _languageUid => protected-1 (integer)modified _versionedUid => protected21 (integer)modified pid => protected76 (integer)
00000000000011880000000000000000 => Hph\Projectmap\Domain\Model\ProjectMapprototypepersistent entitysee above (uid=61, pid=76) 0000000000001d810000000000000000 => Hph\Projectmap\Domain\Model\ProjectMapprototypepersistent entitysee above (uid=57, pid=76) 0000000000001d420000000000000000 => Hph\Projectmap\Domain\Model\ProjectMapprototypepersistent entitysee above (uid=16, pid=76)
image => protectedTYPO3\CMS\Extbase\Domain\Model\FileReferenceprototypemodified entity (uid=1297, pid=76) uidLocal => protected725 (integer) originalResource => protectedTYPO3\CMS\Core\Resource\FileReferenceprototypeobject propertiesOfFileReference => protectedarray(28 items) uid => 1297 (integer) pid => 76 (integer) tstamp => 1709220918 (integer) crdate => 1706542400 (integer) cruser_id => 4 (integer) deleted => 0 (integer) hidden => 0 (integer) sys_language_uid => -1 (integer) l10n_parent => 0 (integer) l10n_state => NULL l10n_diffsource => '{"hidden":""}' (13 chars) t3ver_oid => 0 (integer) t3ver_wsid => 0 (integer) t3ver_state => 0 (integer) t3ver_stage => 0 (integer) uid_local => 725 (integer) uid_foreign => 20 (integer) tablenames => 'tx_projectmap_domain_model_projectmap' (37 chars) fieldname => 'image' (5 chars) sorting_foreign => 1 (integer) table_local => 'sys_file' (8 chars) title => NULL description => NULL alternative => NULL link => '' (0 chars) crop => '{"default":{"cropArea":{"x":0,"y":0,"width":1,"height":1},"selectedRatio":"N
                  aN","focusArea":null}}
' (98 chars) autoplay => 0 (integer) showinpreview => 1 (integer)
originalFile => protectedTYPO3\CMS\Core\Resource\Fileprototypeobject updatedProperties => protectedarray(empty) metaDataAspect => privateTYPO3\CMS\Core\Resource\MetaDataAspectprototypeobject (21 items) uid => 725 (integer) pid => 0 (integer) tstamp => 1706542387 (integer) crdate => 1706542387 (integer) cruser_id => 4 (integer) sys_language_uid => 0 (integer) l10n_parent => 0 (integer) l10n_state => NULL t3_origuid => 0 (integer) l10n_diffsource => '' (0 chars) t3ver_oid => 0 (integer) t3ver_wsid => 0 (integer) t3ver_state => 0 (integer) t3ver_stage => 0 (integer) file => 725 (integer) title => NULL width => 2000 (integer) height => 601 (integer) description => NULL alternative => NULL categories => 0 (integer) properties => protectedarray(15 items) uid => 725 (integer) pid => 0 (integer) missing => 0 (integer) type => '2' (1 chars) storage => 1 (integer) identifier => '/user_upload/984.jpg' (20 chars) identifier_hash => '85213c1c5b13bbec7eee426dc261663a93369e7a' (40 chars) extension => 'jpg' (3 chars) mime_type => 'image/jpeg' (10 chars) name => '984.jpg' (7 chars) sha1 => '729ef7c3e4c5583742cae802b5ecbaca3b64bfd9' (40 chars) size => 137574 (integer) creation_date => 1706542387 (integer) modification_date => 1706542387 (integer) folder_hash => '19669f1e02c2f16705ec7587044c66443be70725' (40 chars) storage => protectedTYPO3\CMS\Core\Resource\ResourceStorageprototypeobject driver => protectedPxhpc\Pxhpc\Xclass\LocalDriverprototypeobject absoluteBasePath => protected'/home/www/p641856/html/typo3/fileadmin/' (39 chars) supportedHashAlgorithms => protectedarray(2 items)max depth baseUri => protected'fileadmin/' (10 chars) mappingFolderNameToRole => protectedarray(3 items)max depth capabilities => protected15 (integer) storageUid => protected1 (integer) configuration => protectedarray(3 items)max depth storageRecord => protectedarray(17 items) uid => 1 (integer) pid => 0 (integer) tstamp => 1652446887 (integer) crdate => 1652446887 (integer) cruser_id => 0 (integer) deleted => 0 (integer) description => 'This is the local fileadmin/ directory. This storage mount has been created
                        automatically by TYPO3.
' (99 chars) name => 'fileadmin' (9 chars) driver => 'Local' (5 chars) configuration => array(3 items)max depth is_default => 1 (integer) is_browsable => 1 (integer) is_public => 1 (integer) is_writable => 1 (integer) is_online => 1 (integer) auto_extract_metadata => 1 (integer) processingfolder => NULL
configuration => protectedarray(3 items) basePath => 'fileadmin/' (10 chars) pathType => 'relative' (8 chars) caseSensitive => '1' (1 chars) fileProcessingService => protectedTYPO3\CMS\Core\Resource\Service\FileProcessingServiceprototypeobject storage => protectedTYPO3\CMS\Core\Resource\ResourceStorageprototypeobjectsee above driver => protectedPxhpc\Pxhpc\Xclass\LocalDriverprototypeobjectsee above eventDispatcher => protectedTYPO3\CMS\Adminpanel\Service\EventDispatchersingletonobjectmax depth evaluatePermissions => protectedFALSE fileMounts => protectedarray(empty) userPermissions => protectedarray(empty) capabilities => protected15 (integer) eventDispatcher => protectedTYPO3\CMS\Adminpanel\Service\EventDispatchersingletonobject dispatchedEvents => protectedarray(1126 items)max depth listenerProvider => protectedTYPO3\CMS\Core\EventDispatcher\ListenerProviderprototypeobjectmax depth processingFolder => protectedTYPO3\CMS\Core\Resource\Folderprototypeobject storage => protectedTYPO3\CMS\Core\Resource\ResourceStorageprototypeobjectsee above identifier => protected'/_processed_/' (13 chars) name => protected'_processed_' (11 chars) fileAndFolderNameFilters => protectedarray(empty)max depth processingFolders => protectedarray(1 item) 0 => TYPO3\CMS\Core\Resource\Folderprototypeobjectsee above isOnline => protectedTRUE isDefault => protectedTRUE fileAndFolderNameFilters => protectedarray(2 items) 0 => array(2 items)max depth 1 => array(2 items)max depth
identifier => protected'/user_upload/984.jpg' (20 chars) name => protected'984.jpg' (7 chars) deleted => protectedFALSE
mergedProperties => protectedarray(47 items) uid => 1297 (integer) pid => 76 (integer) tstamp => 1709220918 (integer) crdate => 1706542400 (integer) cruser_id => 4 (integer) deleted => 0 (integer) hidden => 0 (integer) sys_language_uid => -1 (integer) l10n_parent => 0 (integer) l10n_state => NULL l10n_diffsource => '{"hidden":""}' (13 chars) t3ver_oid => 0 (integer) t3ver_wsid => 0 (integer) t3ver_state => 0 (integer) t3ver_stage => 0 (integer) uid_local => 725 (integer) uid_foreign => 20 (integer) tablenames => 'tx_projectmap_domain_model_projectmap' (37 chars) fieldname => 'image' (5 chars) sorting_foreign => 1 (integer) table_local => 'sys_file' (8 chars) title => NULL description => NULL alternative => NULL link => '' (0 chars) crop => '{"default":{"cropArea":{"x":0,"y":0,"width":1,"height":1},"selectedRatio":"N
                  aN","focusArea":null}}
' (98 chars) autoplay => 0 (integer) showinpreview => 1 (integer) missing => 0 (integer) type => '2' (1 chars) storage => 1 (integer) identifier => '/user_upload/984.jpg' (20 chars) identifier_hash => '85213c1c5b13bbec7eee426dc261663a93369e7a' (40 chars) extension => 'jpg' (3 chars) mime_type => 'image/jpeg' (10 chars) name => '984.jpg' (7 chars) sha1 => '729ef7c3e4c5583742cae802b5ecbaca3b64bfd9' (40 chars) size => 137574 (integer) creation_date => 1706542387 (integer) modification_date => 1706542387 (integer) folder_hash => '19669f1e02c2f16705ec7587044c66443be70725' (40 chars) t3_origuid => 0 (integer) file => 725 (integer) width => 2000 (integer) height => 601 (integer) categories => 0 (integer) metadata_uid => 725 (integer)
modified uid => protected1297 (integer) _localizedUid => protected1297 (integer)modified _languageUid => protected-1 (integer)modified _versionedUid => protected1297 (integer)modified pid => protected76 (integer)
uid => protected20 (integer) _localizedUid => protected20 (integer)modified _languageUid => protected-1 (integer)modified _versionedUid => protected20 (integer)modified pid => protected76 (integer)
absoluteUrl => 'https://www.hamburgportconsulting.com/projects/project/consultancy-services-
      for-preparation-of-a-dredging-project-at-durres-port-984/
' (133 chars)
Consultancy Services for Preparation of a Dredging Project at Durres Port - HPC Hamburg Port Consulting GmbH
Consultancy Services for Preparation of a Dredging Project at Durres Port

Consultancy Services for Preparation of a Dredging Project at Durres Port

The Challenge

In order to allow vessels with a size of 30,000 DWT or 1,700 TEU to visit the Port of Durres in the near future, the entrance channel, the basin and berths of the port should be deepened through a Capital Dredging Campaign, to be tendered by Durres Port Authority. For this reason Durres Port Authority contracted HPC to elaborate the design and complete tender documents for the dredging works to deepen the entrance channel and the basin of its port and to conduct an Environmental Impact Assessment (EIA). The studies were accompanied by field investigations, such as geotechnical investigations, bathymetric surveys and environmental analysis of sediment samples.In order to allow vessels with a size of 30,000 DWT or 1,700 TEU to visit the Port of Durres in the near future, the entrance channel, the basin and berths of the port should be deepened through a Capital Dredging Campaign, to be tendered by Durres Port Authority. For this reason Durres Port Authority contracted HPC to elaborate the design and complete tender documents for the dredging works to deepen the entrance channel and the basin of its port and to conduct an Environmental Impact Assessment (EIA). The studies were accompanied by field investigations, such as geotechnical investigations, bathymetric surveys and environmental analysis of sediment samples.

Tasks Performed

  • Execution, processing and interpretation of bathymetric surveys
  • Execution, processing and interpretation of geotechnical surveys, such as vibro-coring, cone penetration tests, 2D electrical imaging and sub-bottom profiling
  • Laboratory analysis of soil samples
  • Design of dredging works and estimation of dredging volumes and costs
  • Elaboration of Terms of References for dredging works
  • Finalisation of complete tender documents for dredging works
  • Environmental Impact Assessment, including information review, description of legislative and regulative considerations, evaluation of marine sediment quality, investigation of ecological impacts, investigation of socio-economic impacts, determination, mitigation and management of impacts, and preparation of a Construction Environmental Management Plan (CEMP)

Benefit 

  • Client received comprehensive tender documents for dredging works that considered operational, engineering and environmental requirements

HPC's Expertise:
Hydrography & Dredging, Sustainability

Location:
Durres, Albania

Client:
Durres Port Authority

Financed by:
Client

Duration:
05/2010 - 10/2010

Project Team


Jörg Geerke
Jörg Geerke

Send a message

Tatiana Eggert
Tatiana Eggert

Send a message