Challenge

Major clients had asked PTP to increase the number of triple-E-ready berths. Considering the huge investment requirements for new quay cranes, PTP assigned HPC to verify the need by means of simulation and to determine the optimal number and position of such cranes to achieve the desired service level.

Tasks Performed

  • Forecast expected ULCV services for PTP
  • Assess need for additional ULCV quay cranes
  • Determine optimal number and location
  • Establish max quay capacity

Benefit

HPC verified the need for additional quay cranes and identified the best position for new cranes and other potential for improvement.

HPC's Expertise:
Quay Simulation

Standort:
Johor, Malaysia

Kunde:
Pelabuhan Tanjung Pelepas

Finanziert durch:
Client

Laufzeit:
03/2018 – 05/2018