The Challenge

Belfi S.A. has contracted for professional engineering services pertaining to procurement assistance and inspection of engineering, material and equipment supply and erection in China as well as hand-over in Chile for an unloading platform with two bulk handling gantry cranes (grab-type ship unloaders) for E-CL's terminal in Mejillones.

Tasks Performed

  • Elaboration of specifications
  • Assistance in contract negotiations (technically and financially) with ZPMC until final contract signing
  • Design and drawing review in accordance with the technical specifications; check and confirmation whether the crane design is in line with relevant international standards such as DIN, FEM, ISO, IEC, etc. or equivalent, the common engineering practices, state-of-the-art-design and if it complies with professional safety requirements
  • Review of design calculations
  • Permanent construction supervision
  • Attendance of pre-shipment tests at the manufacturer's site
  • Supervision and attendance of final test trials until provisional acceptance of the cranes at the Client's site

Benefit to Client

  • Permanent quality checks throughout the manufacturing period
  • Reduce operational and safety risk to a minimum
  • Asset is built to specification - we make sure that you get what you ordered
  • Quality tests double-checked and confirmed by 3rd party
Olaf Schulz
Bereich

 +49 40 74008-131

Olaf Schulz
Project Director

Alexander Koschinsky
Bereich

Alexander Koschinsky
Mechanical Engineer

Projects you might also be interested in:

send inquiry

+49 40 74008-0